European exhibition workshop / 01

Artwork installed.
Exhibition ready.

Professional preparation, positioning, installation and exhibition-readiness for galleries and exhibition spaces across Europe.

Installation team measuring a pale gallery wall beside an exhibition plan
MEASURE / POSITION / CHECK

Operational scope

Five controlled stages. One gallery-ready result.

Work is organised around preparation, spatial decisions and documented checks. Requirements are confirmed before tools, surfaces or display elements are handled.

Wall-mounted artwork being aligned with a measuring rule

01 / Installation

Gallery Installation Services

Positioning, wall preparation, hanging coordination, display alignment and final gallery readiness.

Key considerations

Wall condition · dimensions · sequence · sightline

Wall worksAlignment
View installation service →
Clean preparation table with gloves, protective material and condition notes

02 / Preparation

Artwork Preparation & Handling

Pre-installation checks, surface awareness, protective preparation and coordinated readiness.

Key considerations

Condition · access · protection · documentation

ReadinessHandling plan
View preparation service →
Sculptural display arranged on plinths in a quiet exhibition room

03 / Display

Exhibition Display Setup

Wall-mounted works, plinths, sculptures, spacing, labels, circulation and lighting coordination.

Key considerations

Scale · sightlines · routes · consistency

PlinthsSpatial setup
View display service →
Empty gallery room prepared for an exhibition changeover

04 / Changeover

Gallery Changeover Services

Removal planning, room preparation, sequential installation and checks between exhibition phases.

Key considerations

Staging · timing · room order · records

Room sequenceTransition
View changeover service →
Exhibition plan, checklist and ruler on a studio worktable

05 / Control

Installation Planning & Quality Checks

Plans, measurements, positioning references, documentation and post-installation inspection.

Key considerations

Drawings · references · records · inspection

ChecklistsDocumentation
View planning service →

The installation control sequence

Prepare → Measure → Position → Install → Check

01

Prepare

Confirm artwork condition, access, surfaces and working area.

02

Measure

Set references for height, spacing, centre lines and routes.

03

Position

Review relationships between works, walls, plinths and sightlines.

04

Install

Coordinate approved hanging and display procedures.

05

Check

Inspect alignment, labels, circulation and room finish.